Please Scroll down for some examples of our work:
Stationers Hall, Ave Maria Lane, London.
In 2010 the Stationers hall suffered a fire which partially destroyed a Grade 1 Listed Screen.
Luard Conservation called us in to provide Temporary sections to enable the Hall to operate fully, while in preperation for Full Restoration this Summer, which we carried out successfully within a tight timescale.
The work was so successful that it was featured in The Times.(see seperate page for the article)
Shortly after the Fire:

New sections fitted in 2011 ready for finishing:

Repairs and Conservation to the Arch Cabinet Pediment:

Please see the dedicated page for The Times article featuring this Restoration to see the finished result! Panelled Wall, Surrey This replacement is due to a Listed building order being enforced.
Shown here prior to surface finishing.
Hinges shown are temporary due to Surface mounted cast hinges being fitted after finishing.


Traditional jointing used throughout in the form of Pegged Mortice and Tenons.
Panelled wall fitted with Intumescent upgrades to theoretical FD60 to meet requirements for use in a public building.
(Please enquire if more detailed information is needed regarding this)

Bespoke Furniture making and fitting:





Extension to a Church Stage with a removable centre section.

